The exact timeline depends on scope, approvals, material lead times y contractor availability, but the work is structured so decisions are made antes de they become site delays.
Survey y brief
Room-by-room scope, technical priorities y finish expectations antes de contractor pricing.
Diseño direction
FF&E link
Furniture y procurement logic connected a the reforma result.
Snagging, final overview y practical readiness antes de move-in o rental.
From existing condition a ordered site work.
Survey y brief
Scope y concept
Pricing package
coordinación de obra
Progress checks, decisions, supplier questions y issue tracking.
Snagging, furniture link-up y final readiness review.
Essential reforma
A controlled refresh para apartments that need visible upgrades but no major replanning.
Non-structural demolition y preparation
Flooring install: laminate, parquet o tile
Standard bathroom refresh con no layout change
Not included
Premium finishes such as microcement o decorative plaster
EUR 750
The common full-apartment reforma route para foreign owners.
Full non-structural demolition y rebuild
Full bathroom y kitchen plumbing replacement
Kitchen preparation y connections
Supervisión de obra y photo reporting
Smart home y advanced lighting scenarios
Acoustic y thermal upgrade package
EUR 1,250
Premium finishes package Custom joinery coordination
Complex lighting y smart switches where required
Premium finishes package Remote-friendly
Most coordination can happen through shared documents, video calls y structured site updates.
Premium finishes package High-end finishes, custom detailing and higher-touch owner control.
For apartments where finish level, custom joinery and handover quality matter more than the lowest build rate.
In Mediterranean homes, terraces are essential para lifestyle value. The goal is not a avoid them. The goal is a diseño them correctly.
Good renovation work depends on the sequence behind the final photos: measured scope, service coordination, clean decisions and enough control to avoid expensive improvisation.
Current photos, plans if available, access details, deadline pressure, target use and budget range.
Scope notes, mood direction, finish schedule, contractor brief, progress review and handover checklist.
Most coordination can happen through shared documents, video calls and structured site updates.
The aim is not just repaired space, but an interior that feels intentional and usable.
FF&E link
Furniture y procurement logic connected a the reforma result.
Ready to review a renovation?
We will map whether you need a scope review, design package, contractor coordination or a fuller turnkey fit-out path.