Danica
ES
Research demonstrates that over 70% of occupants report higher satisfaction when psychological benefits of diseño de interiores are incorporated into planning. This includes considerations like natural light access, acoustic comfort, y spatial proportions that reduce stress.

Arquitectura

Arquitectura postcompra: desde la propiedad hasta la ruta clara del proyecto.

Tender, build o reforma route mapped después de permits.

Proceso y calendarioFrom selected concept a coordinated technical package.Scope depends on local permit rules, consultant responsibilities y whether the proyecto is moving a tender o straight into construcción documentation.Diseño intake
Imagen heroica de diseño conceptual y esquemático de Danica página de servicio principal

Snagging, final overview y practical readiness antes de move-in o rental.

Model structure, drawing list, issue rhythm y coordination responsibilities.

Consultant alignment

Structural, MEP y energy inputs coordinated con architectural intent.

Permit / tender set

Drawings, schedules, specifications y issue revisions.

Clarifications

Tender questions, value engineering y controlled changes.

Tarifas

After-purchase fee structure.

Fees are shaped by property status, permit route, consultant requirements y how much diseño work is already complete.

Essential reforma

Purchase-to-scope audit

01

Alpina is the closest Danica portfolio reference para this topic because it combines compact modular arquitectura, energy-wall thinking, facade restraint y a hospitality-ready interior mood.

A quick go / no-go concept para simple plots.

02

A compact review of documents, condition, constraints y next steps.

Included

03

Document review

Risk y decision notes

04

Next action list

Very rough CAPEX order of magnitude

05

One online review session up a 60 min

Not included

06

Alternative options

3D massing o visuals

EUR 750

Fixed proposal

Concept a permit

1

Private clients y small developers moving toward permits without over-investing.

A defined arquitectura package para concept, drawings y authority pathway.

2

Concept direction

Permit drawing scope

3

Consultant checklist

Simple 3D massing views para the preferred option

4

Area schedules by function

Preliminary CAPEX range y permit roadmap

5

Two online review sessions up a 90 min

Managed

Acoustic y thermal upgrade package

Investors y developers needing a mini-package para partners, banks o city officials.

Ongoing coordination through survey, structure, MEP, energy y permit responses.

Hub de reformas · Jun 14, 2026 / m2

Revision tracking

Premium finishes package Phasing y implementation sketch where relevant

2-3 page concept memo para early conversations

Microcement o decorative plaster as optional upgrades
  • Across Europe, concept y schematic diseño para villas y small hotels commonly ranges around EUR 15-60/m2 depending on scope y complexity. Final fees are fixed después de brief review.
  • Por qué importa
  • Clarity en the model is cheaper than improvisation on site.
  • BIM y technical coordination reduce unclear drawings, late consultant conflicts, avoidable RFIs y tender ambiguity.
  • What we need de you
Good reforma work depends on the sequence behind the final photos: measured scope, servicio coordination, clean decisions y enough control a avoid expensive improvisation.
  • Deliverables
  • BIM model, drawing sets, schedules, specifications, consultant inputs y revision logs.
  • Value engineering
Managed / m2

Consultant coordination

Premium finishes package Investors and developers needing a mini-package for partners, banks or city officials.

Ongoing coordination through survey, structure, MEP, energy and permit responses.

Microcement o decorative plaster as optional upgrades
  • Consultant communication
  • Revision tracking
  • Milestone reports
  • Phasing and implementation sketch where relevant
  • 2-3 page concept memo for early conversations
  • Coordination outline for structure, MEP and landscape
Across Europe, concept and schematic design for villas and small hotels commonly ranges around EUR 15-60/m2 depending on scope and complexity. Final fees are fixed after brief review.

In Mediterranean homes, terraces are essential para lifestyle value. The goal is not a avoid them. The goal is a diseño them correctly.

Clarity in the model is cheaper than improvisation on site.

BIM and technical coordination reduce unclear drawings, late consultant conflicts, avoidable RFIs and tender ambiguity.

What we need from you

Concept package, survey/topo, authority guidance, consultant contacts and target permit/tender route.

Deliverables

BIM model, drawing sets, schedules, specifications, consultant inputs and revision logs.

Value engineering

Alternatives can be reviewed without losing the core design intent.

Change control

Revisions are issued with clear drawing status and coordination impact.

Plano arquitectónico para un servicio de arquitectura posterior a la compra