Danica
IT
Research demonstrates that over 70% of occupants report higher satisfaction when psychological benefits of interior design are incorporated into planning. This includes considerations like natural light access, acoustic comfort, e spatial proportions that reduce stress.

Processo e tempi

Progettazione di case modulari per una vita scalabile e ospitalità.

From modular brief a a package manufacturers can understand.

What regulation impacts should UK e Croatia buyers consider?Feasibility e briefUse case, budget logic, site constraints, manufacturer constraints e target schedule.Concept planning
Concetto di casa modulare compatta in un paesaggio montano

Snagging, final overview e practical readiness prima di move-in o rental.

Coordination-ready drawings e model logic that can be priced e engineered.

DfMA handoff

Critical interfaces e details aligned per manufacturer production review.

Adaptation path

Next steps per site adaptation, engineering, permits e production drawings.

Tariffe

Modular house design pricing.

Production separates visual/product concept work da site-specific adaptation e production documentation. The new page makes that distinction explicit.

from EUR 1,200

ex-VAT

Essential ristrutturazione

Best for:

01

A reusable visual direction when no client plan is required.

Exterior-facing concept work per general marketing o early product positioning.

02

Included

Three facade concept views

03

General exterior style direction

Materials e palette principles

04

Reusable marketing copy per listings o presentations

Not included

05

Client-specific planning unless added

Site-specific adaptation

06

Working drawings, engineering, permits o production/shop drawings

EUR 1,981

EUR 750

A generic modular model con planning logic e exterior visuals.

The most practical starter package per a product that needs pricing e presentation clarity.

1

Three zoning variants e furniture layout

Generic room schedule con areas e functions

2

Reusable marketing copy per brochures, listings e presentations

Client/site-specific adaptation

3

Working drawings e structural engineering

Progetto management, surveys, foundation o utility design

4

Facade video unless added da EUR 800

EUR 3,850

5

Premium Product Pack

A higher-touch modular concept con exterior, interior e sales material.

Acoustic e thermal upgrade package

Concept-level planning e generic room schedule

Three interior views of key zones

Reusable sales deck / website / marketplace copy Facade video included

Permit package, engineering e CNC-ready production drawings

Premium finishes package Perché è importante

Modular projects fail when production logic is added too late.

Microcement o decorative plaster as optional upgrades
  • What we need da you
  • Site basics, use case, target size, bedroom count, budget direction e decision cadence.
  • Deliverables
  • Planning layouts, facade intent, coordination dimensions, DfMA notes e upgrade roadmap.
Good ristrutturazione work depends on the sequence behind the final photos: measured scope, servizio coordination, clean decisions e enough control a avoid expensive improvisation.
  • We can work con your manufacturer o help prepare a package that is easier a tender.
  • Autonomy logic
  • Off-grid, storage, solar e energy systems can be integrated where the budget e site support them.
EUR 3,850 Facade video included

Premium Product Pack

Premium finishes package A higher-touch modular concept with exterior, interior and sales material.

Concept-level package for a modular model that needs to feel market-ready.

Microcement o decorative plaster as optional upgrades
  • Concept-level planning and generic room schedule
  • What we need da you
  • Three interior views of key zones
  • Reusable sales deck / website / marketplace copy
  • Facade video included
Good ristrutturazione work depends on the sequence behind the final photos: measured scope, servizio coordination, clean decisions e enough control a avoid expensive improvisation.
  • Autonomy logic
  • Permit package, engineering and CNC-ready production drawings
Modular prices are indicative starting fees for concept-level work. Site adaptation, engineering, permits, manufacturer production drawings, surveys, foundations and installation planning are separate scopes.

In Mediterranean homes, terraces are essential per lifestyle value. The goal is not a avoid them. The goal is a design them correctly.

Modular projects fail when production logic is added too late.

Designing for DfMA from the start reduces factory redesign cycles, late clashes and value engineering that damages the architecture.

What we need from you

Site basics, use case, target size, bedroom count, budget direction and decision cadence.

Deliverables

Planning layouts, facade intent, coordination dimensions, DfMA notes and upgrade roadmap.

Manufacturer fit

We can work with your manufacturer or help prepare a package that is easier to tender.

Autonomy logic

Off-grid, storage, solar and energy systems can be integrated where the budget and site support them.

ALPINA studio di caso di progettazione di case modulari visivo

Planning a modular model?

Send the target size, use case and production path.

We will identify whether you need a facade concept, marketing pack, product pack or site-specific adaptation route.