The exact timeline depends on scope, approvals, material lead times und contractor availability, but the work is structured so decisions are made vor they become site delays.
Survey und brief
Room-by-room scope, technical priorities und finish expectations vor contractor pricing.
Design direction
FF&E link
Furniture und procurement logic connected bis the Renovierung result.
Snagging, final overview und practical readiness vor move-in oder rental.
From existing condition bis ordered site work.
Survey und brief
Scope und concept
Pricing package
Baustellenkoordination
Progress checks, decisions, supplier questions und issue tracking.
Snagging, furniture link-up und final readiness review.
Essential Renovierung
A controlled refresh für apartments that need visible upgrades but no major replanning.
Non-structural demolition und preparation
Flooring install: laminate, parquet oder tile
Standard bathroom refresh mit no layout change
Not included
Premium finishes such as microcement oder decorative plaster
EUR 750
The common full-apartment Renovierung route für foreign owners.
Full non-structural demolition und rebuild
Full bathroom und kitchen plumbing replacement
Kitchen preparation und connections
Bauüberwachung und photo reporting
Smart home und advanced lighting scenarios
Acoustic und thermal upgrade package
EUR 1,250
Premium finishes package Custom joinery coordination
Complex lighting und smart switches where required
Premium finishes package Remote-friendly
Most coordination can happen through shared documents, video calls und structured site updates.
Premium finishes package High-end finishes, custom detailing and higher-touch owner control.
For apartments where finish level, custom joinery and handover quality matter more than the lowest build rate.
In Mediterranean homes, terraces are essential für lifestyle value. The goal is not bis avoid them. The goal is bis Design them correctly.
Good renovation work depends on the sequence behind the final photos: measured scope, service coordination, clean decisions and enough control to avoid expensive improvisation.
Current photos, plans if available, access details, deadline pressure, target use and budget range.
Scope notes, mood direction, finish schedule, contractor brief, progress review and handover checklist.
Most coordination can happen through shared documents, video calls and structured site updates.
The aim is not just repaired space, but an interior that feels intentional and usable.
FF&E link
Furniture und procurement logic connected bis the Renovierung result.
Ready to review a renovation?
We will map whether you need a scope review, design package, contractor coordination or a fuller turnkey fit-out path.