Modulare Häuser und vorgefertigte Architektur

Passivhaus-Design für Komfort, Effizienz und Baufähigkeit.

A typical one-off Startseite moves through Konzept, BIM and permits, tender, contracting and Bau. Authority timing, size and system choice affect the programme.

Brief and targetsKomfort, energy, Budget, preferred systems and climate assumptions.Konzept and PHPP checksphotos of hidden layers (insulation joints, membrane overlaps, sealing details] für future reference.
Energiestrategie für Passivhäuser mit Solarpanels und Regenwassernutzung

Snagging, final overview und practical readiness vor move-in oder rental.

Tender and contracting

Pricing Unterstützung, BOQ/VE Unterstützung and Auftragnehmer clarifications.

Bau QA

Site checks, airtightness tests, commissioning and Übergabe records.

Scope, priorities, phasing und contractor handoff notes.

Passive House & Design and Build typical Honorare.

The parent page does not publish a blanket price table für this Leistung because the correct scope depends on plot information, document quality und urgency.

of Bau value

Design Scope

Am besten geeignet für:

Essential Renovierung

Typical total Design-only range, lower as a percentage on larger or simpler Startseites.

01

Enthalten

Feasibility & PHPP pre-check: EUR 1,500-3,500 fixed

02

Komfort, energy, Budget, preferred systems and climate assumptions.

Konzept & Schematic: EUR 35-60/m2 GIA, min EUR 6,000

03

BIM & Permit Drawings: EUR 60-100/m2 GIA, min EUR 12,000

PHPP full model & thermal-bridge detailing: EUR 3,500-8,500 per dwelling

04

How are windows installed?

Bauüberwachung & QA: 1.5-3.0% of build, min EUR 8,000

05

of net Bau cost

Design & Build Umsetzung

06

Projects where Danica coordinates general Auftragnehmer / CM Umsetzung.

Pre-Bau, Management, close-out and Bau Umsetzung control.

EUR 750

Tender Koordination and build-stage Management

Close-out and Übergabe Koordination

1

EUR 1,000-6,000

testing / certification items

2

Tests & Certification

Performance verification and optional third-party certification.

3

Specialist performance checks are usually priced separately from Design scope.

Blower-door tests: EUR 1,000-2,500 per test stage, usually two stages

4

Optional PHI certification: typically EUR 3,000-6,000

Commissioning and documentation Koordination where Enthalten in scope

5

Indicative ranges; ex-VAT, excluding surveys, authority or utility Honorare, lab testing and third-party certification unless explicitly scoped.

Quick examples from the parent service page

Acoustic und thermal upgrade package

Assumed build cost

Design (9-12%)

Plot survey/topo, constraints, target area, preferred systems, Budget envelope and timeline. Deliverables

PHPP model, BIM drawings, airtightness details, junction catalogue, tender package and QA checklists.

Premium finishes package Quality tests

Blower-door testing, HRV balancing, commissioning and as-built documentation.

Microcement oder decorative plaster as optional upgrades
  • Design freedom
  • Passive performance is not one visual style; we keep the physics right under the chosen Architektur.
  • Planung a low-energy Startseite?
Send the plot link, target area and performance goals.

We will confirm the right scope: PHPP pre-check, Konzept, permit package, tender Unterstützung or Design-build Koordination.

Recent works2026 © DanicaArchitektur · Interior Design · Renovierung · Energy-efficient StartseitesGC/CM 10%Tests & cert. est.
120 m2EUR 1,600/m2 -> EUR 192,000EUR 17,000-23,000EUR 19,200EUR 3,000-6,000
180 m2EUR 1,700/m2 -> EUR 306,000EUR 27,000-37,000EUR 30,600EUR 3,000-6,000
250 m2EUR 1,800/m2 -> EUR 450,000EUR 36,000-50,000EUR 45,000EUR 3,000-6,000

In Mediterranean homes, terraces are essential für lifestyle value. The goal is not bis avoid them. The goal is bis Design them correctly.

Passive performance is a coordination problem as much as a specification problem.

Comfort, low running cost and airtightness are won through early decisions, consistent details and disciplined QA rather than a single expensive material choice.

What we need from you

Plot survey/topo, constraints, target area, preferred systems, budget envelope and timeline.

Deliverables

PHPP model, BIM drawings, airtightness details, junction catalogue, tender package and QA checklists.

Quality tests

Blower-door testing, HRV balancing, commissioning and as-built documentation.

Design freedom

Passive performance is not one visual style; we keep the physics right under the chosen architecture.

Fassade einer Passivhausvilla in einem Kiefernwald

Planning a low-energy home?

Send the plot link, target area and performance goals.

We will confirm the right scope: PHPP pre-check, concept, permit package, tender support or design-build coordination.