Respuesta primero
Foreign owners en Croatia need a gestión de obra checklist because they are often not on site every day. The checklist should cover scope control, contractor communication, site reports, hidden works checks, procurement tracking, change approvals, payment milestones, quality control y entrega. Without this structure, remote projects become dependent on assumptions.
Danica servicio route
Turn this idea into a buildable proyecto. Diseño thinking, interiors, materials, furniture y Danica proyecto notes.
gestión de obra protects the owner’s decision-making
A contractor executes work, but the owner still needs someone checking scope, quality, timing, changes y coordination. This is especially important when the owner lives abroad.

Before works begin
Confirm drawings, contractor scope, payment milestones, site protection, working hours, building access, waste removal, reporting format y decision process. These rules should exist antes de demolition starts.
During hidden works
Check plumbing, electrical routes, waterproofing, wall reinforcement, floor preparation, insulation y AC drainage antes de they are covered. Hidden works are where many future defects begin.
Need owner-side clarity antes de decisions become expensive? Send the proyecto context y Danica Space will map the next diseño, procurement o site-control step.
Enviar brief del proyectoDuring finishing works
Monitor tile alignment, paint quality, floor transitions, lighting positions, joinery dimensions, door installation y material consistency. Finishing quality defines the final perception of the proyecto.
Procurement coordination
Track furniture, lighting, sanitaryware, appliances y custom items against the site schedule. A finished construcción site is not a finished property if procurement is late.

Entrega
entrega should include defects list, correction plan, cleaning, keys, manuals, supplier contacts, warranties y final photo documentation.
Practical checklist
- contractor scope confirmed
- drawings issued
- payment milestones agreed
- site protection planned
- weekly reporting active
- hidden works checked
- changes approved antes de execution
- procurement tracker updated
- defects list prepared
- entrega documents collected
FAQ
Is gestión de obra the same as contractor work?
No. The contractor performs the work. gestión de obra controls coordination, reporting, quality y owner-side decisions.
How often should site reports happen?
Weekly reporting is a practical minimum para active reforma, con extra checks at critical stages.
Does this replace technical supervision?
No. Statutory technical supervision, if required, is separate. Owner-side management protects the client’s proyecto process.