Answer-first
Apartment renovation handover should be a structured process, not a quick key exchange. The owner should receive a defects list, correction confirmation, final cleaning, manuals, warranties, paint and material references, appliance documents, keys, access information, supplier contacts, FF&E status and maintenance notes. This is especially important for remote owners.
Danica service route
Turn this idea into a buildable project. Design thinking, interiors, materials, furniture and Danica project notes.
Handover is where hidden problems become visible
A renovation may look finished in photos, but handover is the moment when everything must be checked as a working property. Lights, doors, drains, appliances, furniture and finishes should all be tested.

Defects list
Prepare a room-by-room defects list with photos, responsible party, deadline and correction status. Do not rely on memory or verbal promises.
Technical checks
Check water pressure, drainage, hot water, ventilation, electrical sockets, switches, lighting, AC, appliances, doors, locks and windows. Bathrooms and kitchens need special attention.
Need owner-side clarity before decisions become expensive? Send the project context and Danica Space will map the next design, procurement or site-control step.
Send Project BriefFF&E and furniture checks
Confirm that furniture is delivered, assembled, undamaged and placed correctly. Check curtains, mirrors, lighting fixtures, textiles, kitchenware and outdoor furniture if included.
Documents and maintenance
Collect manuals, warranties, supplier contacts, paint colors, material references, spare tiles if available and maintenance instructions. This makes future repairs easier.

Danica Space role
Danica Space can support renovation handover as part of owner-side construction management, FF&E coordination and final readiness for second homes, rentals and resale properties.
Practical checklist
- room-by-room defects list
- photos of issues
- water and drainage test
- lighting and sockets test
- AC and ventilation check
- doors and locks check
- appliance manuals collected
- warranties collected
- paint/material references saved
- FF&E installed
- final cleaning completed
- keys and access confirmed
FAQ
Should I pay the final amount before handover?
Payment terms depend on the contract, but defects and completion status should be documented before final acceptance.
Can handover be done remotely?
Yes, if someone trusted checks the property and sends structured photo/video documentation.
What is often forgotten?
Manuals, warranties, spare materials, paint references and small defects in lighting, doors or bathrooms.
Discuss this project with Danica Space. Share the property, timeline and decision stage so the team can suggest the right next route.
Contact Danica
Send brief